Tag: KAL-Marseille

Marseille Tee KAL

Update: Current Three Priorities

Hello everyone,

Just wanted to post a quick status update on the current three priorities.

under constructionPriority 1: Knittingtoday.com e-commerce website.

I’m currently working on getting the Knitting Today e-commerce website operational. I can’t make money if I can’t sell anything and that is the vehicle to sell it through. We are selling out existing stock from the storefront in our e-bay stores (bondknitter and icefisherman1). I’m curious, what would you buy onlineĀ if I offered it? Needles, machines, patterns, yarn, clubs, knitalongs? Be specific!!!

Priority Two: Education and Inspiration.

Finish some existing projects and start a new one.

  • I am so close to finishing the Stormy Weather Tunic turned Cardigan that I can taste it! Of course I’m not going to wear it in 92 degree heat, but I want it ready for cool nights on the pontoon.
  • Marseille Tee, going to LK150 this one. Just need to get started on the gauge swatch. I’ll blog and periscope while I’m doing it.
  • Fisher Lassie, the next hand knit cardigan. Need to finish the gauge swatch and write the blog post about it.
  • Reyna, a handknit scarf saved for community knitting.

Priority 3: Education and Community.

Get some online classes loaded and discussion going in the forums. I have formatting and design issues to work through. But the two classes I have on my list is: Get It Out of the Box (LK150) and Cables (USM and LK150). I have a multitude of hand knitting ideas floating around, but I don’t think of those as classes, rather instruction during the Knitalongs.

Thank you

Thank you, each of you, for hanging in here with me while I get everything operational. Comment below and let me know what you are working on now!

P.S. you have to be a member and log-in to comment.